日韩精品久久久久久免费-日日摸日日碰人妻无码-国产乱了真实在线观看-内射女校花一区二区三区

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

日本熟妇色videosexvideosex| 波多野结衣在线播放| 被迫多次高潮抽搐| 亚洲综合色噜噜狠狠网站超清| 自慰激情毛片免费| 色婷婷哥在线| 亚洲H在线播放在线观看H| 亚洲乱码国产乱码精品精| 97超碰 乱| 国产欧美综合在线| 中国国产精品高清乱伦色欲 | 国产三级片在线视频| 欧洲AV无码精品午夜飞机馆| 自拍偷区亚洲网友综合图片| 精品婷婷乱码久久久久 | 日韩337人体| 久久久久久久久久99精品 | 日本成人电国产一区| 五月丁香婷婷中文| 蜜芽成人在线观看| 熟女AA级毛片天堂影院一| www.好屌妞| 熟女 区 乱| 国产精品自慰网站| 奇米777免费视频| 俄罗斯一级特黄网站| 亚洲av手机| 国产精品爽爽爽www明星视频| 成人免费午夜一区二区免费| 色哟哟在线免费观看| av片在线播放| 人人妻人人爽凹凸| 一区二区三区亚洲色| 免费成人短片| 在教室伦流澡到高潮hnp视频| 丝袜长腿毛片网址| 粗大挺进朋友人妻淑娟| 国产精品无码一区二区三级百度| 调教小奴高潮惩罚play露出| 被两个两个黑人吃奶4P视频| 国产果冻豆传媒麻婆|