日韩精品久久久久久免费-日日摸日日碰人妻无码-国产乱了真实在线观看-内射女校花一区二区三区

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

伊人蕉久中文字幕无码专区| 中文字幕亚洲人妻系列| 精品品品品品成人片| 久久福利视频免费观看| 奇米精品一区二区三区四区| 最新无码日韩| 男女乱婬免费视频国产高清| 日产无码久久| 欧美美女被极限高潮| 欧美孕妇变态孕交粗暴| 无码网站免费在线| 深爱激情开心网| 国产激情精品一区二区三区| 看国产真人操逼视频| 97国产精品无码免费| 搡老女人老91妇女老熟女oo| 国产高清在线精品一区APP| 国产天堂av片| 久久成人国产精品| 亚洲老熟女内射偷自拍45页| 丝袜香蕉AV| 秋霞无码一区二区| 美女大量吞精在线观看456| 男人天堂无码| 琪琪色原网站在线观看| 熟女桃色视频| 无码不卡电影| 日韩视频在线观看| 嗯嗯啊好深国产精品| 情侣搜索结果 - 麻豆AV| 国产精品成人亚洲777| 蜜臀av在线免费一区二区 | 资源久久AV| 久久久久久久成人网| 人妻丰满熟妇AV无码处处不卡| 顶级少妇美女销魂艳妇影院 | 又摸又揉又黄又爽的视频| 国产精品一色哟哟| 国产精品香蕉在线的人| 欧美性爱一区二区三区四区视频| jizz中国美女|