亚洲av无码成人精品区,精品综合久久久久久97,久久精品无码专区免费青青,色五月丁香五月综合五月

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

俄罗斯女人一区二区视频| 人妻无码P135| 久久亚洲精品无码怀孕| 乱伦AV中文字幕| 精品国产YW在线观看| 日熟妇一区二区三区| 国模小黎自慰gogo人体| 欧洲阿V视频在线一区| 荫蒂添的好舒服视频囗交软件| 国产极品探花一区二区三区免费| 国产无码你懂得| 美女末成年视频黄是免费网址| 人人操人人摸人人插| av天堂影片网| 成人国内精品| 欧美色图图片小说| 人妻丝袜中文无码AV影音先锋专区| 一本色道久久综合亚洲精品| 人人爽人人妻蜜臀人人澡| 亚洲熟少妇精品| 18禁毛片免免费观看| 波多野结衣福利视频| 狠狠色狠狠色综合久久伊人| Jizz精品视频| 少妇高潮在线视频| 日本一道本一二三区| 无码成人在线| 成人免费AA片在线观看| 国产视频第十六页| 黄色A级国产免费大片| 亚洲黑人巨大在线观看| 一区二区三区色色| 亚洲综合成人在线视频| 日本大屁股少妇| 成全动漫在线观看免费高清| 欧美国产成人精品二区芒果视频| 把腿扒开做爽爽视频| 亚洲综合成人午夜| 黑巨茎破女处毛片| 久久精品天天中文字幕人妻| 鲁一鲁一鲁一鲁一澡|